Top 10 Wind Energy Companies in Gujarat (2026): Projects and Capacity

By Vineet Mittal

November 10, 2026

Top 10 Wind Energy Companies in Gujarat (2026): Projects and Capacity

Gujarat has become a leading hub for wind energy in India, attracting developers and turbine manufacturers with projects, factories and orders across the state. As of 31st August 2026, Gujarat had an installed wind power capacity of 16,721.75 MW, the highest among Indian states. This strong presence reflects the state’s growing role in India’s wind energy sector and its appeal to companies looking to expand their operations.

Wind Energy Companies in Gujarat at a Glance

The table below highlights some of the best wind energy companies operating in Gujarat, their roles in the sector and evidence of their presence in the state. It is organized by business role, not ranked by performance or installed capacity.

CompanyRoleGujarat presenceCapacity or order size
Avaada GroupDeveloperHybrid wind-solar agreement with the state government, mainly Kutch wastelands6 GW agreed; about 2 GW operational or in implementation
Adani Green EnergyDeveloperKhavda Renewable Park, Kutch9,500 MW hybrid allocation on 19,000 hectares
NTPC Renewable EnergyDeveloperKhavda Renewable Park allottee, KutchAllocation within the 30 GW park
PowericaDeveloperBotad wind farm100 MW, 28 turbines
SuzlonTurbine makerBlade plant at Bhuj, Kutch; a further Gujarat blade factory plannedOrder book about 6.1 GW at end of Q1 FY2027
Inox WindTurbine makerNacelle and hub plant at Kalyangarh near Ahmedabad; 50 MW turnkey order at Dayapar, KutchPlant capacity 1.2 GW a year; 50 MW order
Adani WindTurbine makerTurbines commissioned at Khavda, KutchMore than 2 GW of 5.2 MW turbines
GE VernovaTurbine makerBotad wind farm order100 MW, 28 turbines, ordered June 2026

Top Wind Energy Companies in Gujarat

Here are the top wind energy companies in India that are contributing to Gujarat’s wind energy sector through renewable energy project development, turbine manufacturing, equipment supply and wind farm installations. Their profiles highlight their roles, key projects and documented presence in the state.

Wind Project Developers

Wind project developers plan, build and operate wind or hybrid renewable energy projects. The following companies have a documented presence in Gujarat through proposed investments, project allocations or wind farm development.

Avaada Group

Avaada Group is a renewable energy developer planning large-scale wind-solar projects as a wind energy company in Gujarat.

  • Headquarters: Mumbai, Maharashtra
  • Role: Renewable energy developer
  • Gujarat projects: In January 2024, Avaada signed a memorandum of understanding with the Government of Gujarat to develop 6 GW of hybrid wind-solar capacity, with a proposed investment of around ₹40,000 crore. The projects are planned across several districts, particularly wasteland areas in Kutch.
  • Expected generation and offtake: The projects were expected to generate around 17.5 billion units of electricity annually, supplying utilities such as GUVNL and supporting captive demand for green hydrogen and ammonia production.
  • Employment: The announcement indicated around 1,200 direct and indirect jobs.
  • Project status at announcement: Around 2 GW of projects in Gujarat were operational or at different stages of implementation when the agreement was signed.

Adani Green Energy

Adani Green Energy is one of the top wind energy companies in India that develops and operates renewable energy projects, including large-scale solar and wind installations at Khavda in Gujarat’s Kutch district.

  • Headquarters: Ahmedabad
  • Role: Renewable energy developer, owner and operator
  • Gujarat projects: The Khavda Renewable Energy Park is planned across approximately 72,400 hectares of government wasteland. Its overall planned capacity is 30 GW, comprising 26 GW of solar and 4 GW of wind power.
  • Capacity allocation: Adani Green Energy has been allocated 9,500 MW of hybrid capacity across 19,000 hectares.
  • Project status: Construction began in December 2020. About 2,031 MW is operational and 2030 is the expected full commissioning date.
  • Wind installation: A 250 MW wind turbine installation became operational in July 2024, according to the same source.

NTPC Renewable Energy

NTPC Renewable Energy is one of the best green energy companies in India and is NTPC’s renewable energy development arm. It is involved in the Khavda Renewable Energy Park in Gujarat.

  • Headquarters: New Delhi
  • Role: Public sector renewable energy developer
  • Gujarat projects: The company is listed among the allottees at Khavda in Kutch, alongside other developers and state-linked entities.

Powerica

Powerica operates in the wind power sector as an independent power producer and engineering, procurement and construction (EPC) contractor. This wind energy company in Gujarat has a wind project in Botad district.

  • Headquarters: Mumbai
  • Role: Independent power producer and wind EPC contractor
  • Gujarat project: A 100 MW wind farm at Botad, comprising 28 turbines.
  • Turbine order: Powerica placed an order with GE Vernova in June 2026 for the turbines.

Wind Turbine Manufacturers

Wind turbine manufacturers supply the equipment used to convert wind energy into electricity. Some also provide project installation, engineering and maintenance services. The companies below have a manufacturing facility, turbine installation or order linked to Gujarat.

Suzlon

Suzlon manufactures wind turbines and provides engineering, procurement, construction, operations and maintenance services. Its Gujarat presence includes a blade manufacturing facility and plans for additional manufacturing capacity.

  • Headquarters: Pune
  • Role: Wind turbine manufacturer, EPC and operations and maintenance services provider
  • Gujarat manufacturing: One of Suzlon’s existing blade plants is located in Bhuj, Kutch.
  • Expansion plans: A further blade factory in Gujarat is part of a ₹550 crore investment covering three plants, with operations planned by 2027.
  • Order book: Around 6.1 GW at the end of Q1 FY2027, following deliveries of 2,456 MW in FY2026.

Inox Wind

Inox Wind is one of the top green energy companies in India that manufactures wind turbines and provides turnkey solutions for wind power projects. Its Gujarat footprint includes a manufacturing facility near Ahmedabad and a project order in Kutch.

  • Headquarters: Noida
  • Role: Wind turbine manufacturer and turnkey project provider
  • Gujarat manufacturing: Its nacelle and hub plant at Kalyangarh near Ahmedabad has an annual capacity of 1.2 GW approved by the National Institute of Wind Energy. The facility supplies 3 MW-class turbines and is intended to support upcoming 4X MW-class machines.
  • Facility inauguration: The plant was inaugurated in December 2025 alongside an Inox Solar module plant at Bavla.
  • Gujarat project order: Inox Wind received a letter of intent from NLC India for a 50 MW turnkey project at Dayapar in Kutch. The project uses 2 MW DF 113/92 turbines and includes more than 10 years of operations and maintenance after commissioning.
  • Order book: Around 4.7 GW, against reported annual manufacturing capacity of approximately 2.5 GW.

Adani Wind

Adani Wind is the turbine manufacturing business within the Adani Group as one of the top wind energy companies in India. Its Gujarat footprint is closely linked to the Khavda Renewable Energy Park in Kutch.

  • Headquarters: Ahmedabad
  • Role: Wind turbine manufacturer
  • Gujarat installations: More than 2 GW of its 5.2 MW turbines have been commissioned at Khavda, making it the company’s largest single deployment.
  • Manufacturing capacity: Around 2.25 GW annually.
  • Order book: The report cites a 750 MW order book for its 3.3 MW turbine platform in FY2026–27.

Also Read: Best Renewable Energy Companies in Ahmedabad – Always Clean, Always On

Key Wind Energy Project Locations in Gujarat

Gujarat added 1,265.72 MW of wind power capacity between January and June 2026, accounting for 43.16% of the total capacity added across India during that period. Several districts contribute to this growth through wind farms, renewable energy parks and manufacturing facilities.

Major Wind Energy Locations in Gujarat

  • Kutch: The district hosts major renewable energy developments. The Khavda park at Vighakot covers 72,400 hectares of government wasteland. Dayapar has wind project development activity, while Bhuj has a wind turbine blade manufacturing plant.
  • Botad: This Saurashtra district hosts Powerica’s 100 MW wind project, for which GE Vernova received an order to supply 28 turbines.
  • Ahmedabad district: The area supports wind energy manufacturing. Inox Wind operates a nacelle and hub manufacturing facility at Kalyangarh, while Bavla has a solar module manufacturing plant.
  • Saurashtra and the coastal belt: Areas across Kutch, Jamnagar and Devbhumi Dwarka have attracted wind energy projects because of their wind resources and coastal location.

Gujarat’s wind energy growth is supported by strong coastal and desert wind resources, along with large areas of land suitable for renewable energy projects. Its installed wind capacity of 16,721.75 MW as of 31st August 2026 represents only part of this estimated potential.

Gujarat Renewable Energy Policy 2023: Key Benefits for Wind Developers

Gujarat’s Renewable Energy Policy 2023 outlines measures to support renewable energy projects, including wind and hybrid systems. Its key provisions can affect project planning, investment decisions and power purchase arrangements.

  • 100 GW renewable energy target: Gujarat aims to achieve 100 GW of total renewable energy capacity by 2030.
  • Support for hybrid projects: Existing wind, solar and standalone renewable energy projects can be converted into hybrid projects, subject to the applicable policy provisions. This allows developers to combine wind and solar generation and make better use of existing infrastructure where permitted.
  • Support for prototype turbines: The policy supports the installation of prototype wind turbine generators, including offshore designs, helping developers and manufacturers test new technologies.
  • Fixed tariffs for small wind projects: Distribution companies may purchase power from wind projects of up to 10 MW at a pre-determined levelised tariff. The tariff remains fixed for the 25-year power purchase agreement, subject to the applicable conditions and a bank guarantee from the developer.
  • Policy validity: The policy is valid until 30 September 2028.

For wind developers, the provisions on hybrid projects and long-term tariffs are particularly relevant. They can influence how projects use existing infrastructure, plan investments and estimate revenue over the contract period. Developers should review the applicable conditions before making project decisions.

Conclusion

Gujarat continues to lead India in installed wind power capacity, accounting for 43.16% of the country’s new wind capacity additions in the first half of 2026. The state is also seeing greater interest in hybrid renewable energy projects that combine wind and solar power, helping developers make better use of available land and grid infrastructure.

Looking to power your business or industrial facility with wind or hybrid renewable energy in Gujarat? Avaada Group can help you explore solutions tailored to your energy requirements, including round-the-clock renewable power options.

Connect with our team to discuss your project needs and find a suitable renewable energy solution.

FAQs

How much wind power capacity does Gujarat have?

Gujarat had 16,721.75 MW of installed wind capacity at the end of August 2026, the highest of any Indian state. It generated 33,706 million units in FY2025-26.

Kutch leads by a wide margin, holding the Khavda park, the Dayapar tendered site and blade manufacturing at Bhuj. Botad hosts a 100 MW project and the Saurashtra coastal belt including Jamnagar and Devbhumi Dwarka has long-standing wind farms.

Adani Green Energy holds a 9,500 MW hybrid allocation at Khavda, where Adani Wind has commissioned more than 2 GW of turbines. Avaada Group’s 6 GW hybrid agreement centres on Kutch wastelands and Inox Wind holds a 50 MW turnkey order at Dayapar.

The Gujarat Renewable Energy Policy 2023 puts the state’s wind potential at 143 GW. Installed capacity of 16,721.75 MW is close to a tenth of that, so most of the resource is still unbuilt.

Suzlon has a blade plant at Bhuj and a further Gujarat blade factory planned by 2027. Inox Wind runs a 1.2 GW nacelle and hub plant at Kalyangarh near Ahmedabad, inaugurated in December 2025. Adani Wind manufactures within the state as well.